On September 29, 2016, the NRC issued a Notice of Violation to Jenbo USA Inc., (Jenbo) for a Severity Level (SL) III violation and a SL III problem for two related violations. The first violation involved a failure to submit annual reports detailing all transfers of byproduct material, in accordance with10 CFR 32.16. Specifically, between 2012 and 2016, Jenbo failed to file annual reports for transfers of byproduct material made in 2011, 2012, 2013, 2014, and 2015, on or before January 31 of the following year. The violations collectively characterized as a SL III problem involved a failure to obtain a license amendment to change the authorized location in license No. 04-23986-01E, and for distribution of byproduct material from an unauthorized location. Specifically, in 2014, Jenbo distributed byproduct materials at 3672 Edison Way, Freemont, CA, which was not an authorized location in the specific license issued by NRC and did not obtain required authorization to include this new location in its license.